Case Study: Velocity Electrical achieves greater freedom and productivity with AroFlo

A AroFlo Case Study

Preview of the Velocity Electrical Case Study

Velocity Electrical now runs not one, but two businesses from abroad – all thanks to the flexibility of AroFlo

Velocity Electrical, a NSW-based electrical contracting business, grew quickly from a one-man operation to eight employees, but the expansion brought heavy paperwork, incomplete timesheets, and long hours for director Michael Brewitt. The team needed a better way to manage field staff, streamline workflows, and free Michael from being stuck in day-to-day administration. AroFlo job management software was chosen as the solution.

AroFlo gave Velocity Electrical full visibility across jobs, time tracking, materials, invoicing, and staff scheduling, while eliminating the need for costly on-premise IT infrastructure. The results were significant: 80% less paper usage, a 40% increase in billable hours, a 100% improvement in invoicing turnaround time, and a 100% increase in productivity. With AroFlo, Michael was able to run the business remotely and even launch a second company.


Open case study document...

Velocity Electrical

Michael Brewitt

Director


AroFlo

34 Case Studies