Ken's Foods, a national salad dressing manufacturer, needed to complete a fast-track installation of finished flooring in a new 30,000-square-foot office building. The challenge involved freshly poured concrete slabs with high moisture content (RH) on three floors, which typically causes significant delays. The vendor, ARDEX Americas, was approached for a solution to meet the aggressive schedule.
ARDEX Americas provided its ARDEX Concrete Management Systems (ACMS) solution, which utilized ARDEX MC RAPID to control moisture and prepare the slabs. This system allowed the flooring to be installed almost immediately, avoiding the usual delays from moisture mitigation and leveling. The result was a reliable, high-quality substrate completed on time, providing significant value to Ken’s Foods and the general contractor by ensuring the project stayed on its fast-track schedule.