Case Study: Bayhealth Hospital achieves moisture-controlled, level flooring on a fast-track schedule with ARDEX Americas

A ARDEX Americas Case Study

Bayhealth Hospital completes 125,000 sq. ft. flooring project ahead of schedule with ARDEX Americas

Bayhealth Hospital faced a challenge with high moisture readings and an uneven concrete substrate across 125,000 square feet of a new, fast-track construction project. ARDEX Americas provided a solution using their ARDEX MC RAPID moisture control system and ARDEX V 1200 Self-Leveling Underlayment to prepare the subfloor for finished flooring.

The ARDEX system created a flat, level, and moisture-protected surface, allowing the installers to complete the work ahead of schedule. This solution ensured the project's on-time completion and came with a comprehensive 20-year system warranty from ARDEX Americas.


View this case study…