The customer, Ameriprise Financial, faced a challenge during the renovation of its Minneapolis office: installing a 25-year warranted tile system over an existing concrete access panel floor that could not be removed. ARDEX Americas provided a solution using a system of its high-performance products, including ARDEX UI 740 FLEXBONE uncoupling membrane and ARDEX S 28 rapid-set mortar, to meet this demanding requirement.
ARDEX Americas' solution involved extensive surface preparation and the strategic application of its specialized mortars, uncoupling membrane, epoxy grout, and sealant. The result was the successful installation of a 6,000-square-foot floor with cement terrazzo pavers, achieving Ameriprise Financial's goal of a long-term, warranted tile system for its office renovation.