Case Study: PW Hall Ltd safeguards manufacturing and achieves rapid recovery with Arcserve UDP Appliance and Arcserve Cloud

A Arcserve Case Study

Preview of the PW Hall Ltd Case Study

PW Hall Ltd safeguards sales, manufacturing and user productivity with Arcserve UDP Appliance and Arcserve Cloud

PW Hall Ltd is a 50‑person Glasgow manufacturer of plastics colour concentrates with around 60% of sales exported. The company faced growing data volumes and an ageing tape backup process that created long, unreliable backup windows (sometimes over 13 hours) and put manufacturing, sales and user productivity at risk if IT outages occurred.

After a two‑month trial PW Hall deployed the Arcserve UDP Appliance with Arcserve Cloud (implemented with partner Epaton) to protect ~3 TB across 12 virtual and 5 physical servers (SQL, ERP, Exchange and flat files). Incremental backups throughout the day reduced the backup window to about 90 minutes, offsite replication enables rapid DR (mailbox restores in ~15 minutes) and the move from tape freed SAN capacity, cut storage costs and materially reduced operational risk.


Open case study document...

PW Hall Ltd

Robert Jackson

IT Manager


Arcserve

168 Case Studies