Aquicore
11 Case Studies
A Aquicore Case Study
The Texas Rangers' Globe Life Park, a large baseball stadium in Arlington, Texas, faced high energy costs from its HVAC systems, which were difficult to manage due to an outdated building management system that lacked operational visibility. To address this challenge, the facility partnered with Aquicore to optimize its substantial chiller plant and improve efficiency.
Aquicore implemented data-driven operational changes that optimized the staging of HVAC equipment, allowing the stadium to reduce the number of chillers running during off-peak times. This solution delivered significant results, including $244,000 in savings and a 26% reduction in kWh usage since 2017, dramatically improving the facility's performance against its energy targets.
Sean Decker
Senior Vice President Operations & Events