Case Study: Vollers Excavating & Construction pinpoints a deep chilled water leak with Aquam Corporation’s Investigator™

A Aquam Corporation Case Study

Preview of the Vollers Excavating & Construction Case Study

Vollers Excavating & Construction avoids $100,000 excavation with Aquam Corporation

Vollers Excavating & Construction needed to locate a complex leak on a 12-inch steel chilled waterline buried 10 feet underground without incurring significant excavation costs. Due to the leak's size, the pipe could not be pressurized, rendering traditional acoustic methods ineffective. The company enlisted Aquam Corporation, using its Investigator™ technology for an internal inspection.

Aquam Corporation's solution involved inserting the Investigator™ tool into the live waterline via a 2-inch tap. The tool successfully pinpointed the leak's exact location nearly 12 feet down on a vertical section of pipe, confirming it was in the area that justified a shallower, less costly repair. This precise identification by Aquam Corporation saved Vollers over $100,000 in potential excavation costs and confirmed the overall integrity of the pipeline.


View this case study…

Aquam Corporation

14 Case Studies