Case Study: Boston Centerless achieves a 20% production increase and faster, more accurate order-to-delivery with Aptean Industrial Manufacturing ERP

A Aptean Industrial Manufacturing ERP Case Study

Preview of the Boston Centerless Case Study

Boston Centerless - Customer Case Study

Boston Centerless, a leader in precision ground bar materials and grinding services, was operating on an aging custom Pick-based system that lacked analytics, required manual preparation of specification and certification documents, and contributed to long quote-to-delivery lead times. To modernize and gain better vendor support, they selected Aptean Industrial Manufacturing ERP Made2Manage Edition from Aptean.

Aptean implemented its Industrial Manufacturing ERP with Advanced Configurator, FastForms and targeted customizations to automate quoting, order processing, certificate generation and capture critical specification fields for reporting. By using Aptean’s solution, Boston Centerless increased production by over 20% without added staff, improved on-time delivery from 88% to 98%, reduced order-to-floor time from three days to one, and delivered more accurate, timely data for decision-making.


Open case study document...

Boston Centerless

Robert Berger

IT Director


Aptean Industrial Manufacturing ERP

40 Case Studies