Aphex
63 Case Studies
A Aphex Case Study
BAM Nuttall, a major infrastructure contractor, faced significant challenges in planning and scheduling for a £480 million redevelopment project at London City Airport. Their team struggled with manual, spreadsheet-based planning, which was time-consuming and inflexible. This led to missed deadlines for their critical 4-week lookahead plans and difficulty managing frequent design changes and resequencing. To overcome this, they implemented the Aphex platform.
Using Aphex allowed the planning team to collaborate in real-time, breaking down master schedule activities into smaller tasks and instantly visualizing the impact of changes. This eliminated the need for tedious manual resequencing in spreadsheets. As a result, the team, led by Planning Engineer Abigail Akyeampong, has not missed a single submission deadline since implementation. Their 4-week lookahead is now submitted on time every Friday, leading to a more consistent workload and a happier, more in-control team. Progress is also now automatically tracked within Aphex, saving further time previously spent deciphering site diaries.