Balfour Beatty, a major construction and infrastructure company, faced significant challenges with short-term planning on the London Power Tunnels 2 project. Their previous methods, which relied on Microsoft Excel and Project, were inefficient and lacked real-time coordination, causing updates to be time-consuming and plans to become quickly outdated. To overcome these limitations, they turned to the vendor Aphex for a more dynamic planning solution.
By implementing Aphex, Balfour Beatty gained a live, visual planning system that dramatically improved coordination and visibility for the entire site team. The solution from Aphex delivered substantial time savings, reducing the weekly process of updating the six-week lookahead from 4-5 hours to less than an hour, and provided a single source of truth for daily operations.