Case Study: GSE Engineering reduces turnaround time and paperwork with APE Mobile

A APE Mobile Case Study

Preview of the GSE Engineering Case Study

Reduced turn-around time and 70% cut down on paperwork

GSE Engineering, a provider of geotechnical, structural, and environmental engineering services, was facing significant delays with field paperwork, which took over two weeks to return to the office and often arrived damaged and illegible. Additionally, internal spreadsheets were prone to errors as formulas were accidentally deleted. To solve this, they turned to APE Mobile.

By implementing APE Mobile, GSE's field technicians used wireless devices to complete and send paperwork digitally from the job site, eliminating damaged forms and delays. APE Mobile's solution also protected spreadsheet formulas from accidental edits. This resulted in a dramatic reduction of their turn-around time from over two weeks to just three days and cut paper usage by 70%.


Open case study document...

APE Mobile

6 Case Studies