ICP Group, one of the world’s largest coatings, adhesives and sealants manufacturers, faced supply-chain complexity after rapid growth and acquisitions: over 20 North American sites, nearly 30 distribution centers, 10,000+ SKUs, rising demand and frequent disruptions. To gain end-to-end visibility and build a digital twin for network optimization, ICP partnered with SimWell and the anyLogistix supply‑chain simulation and optimization platform.
Using an integrated data architecture (SAP, Azure, Alteryx, Power BI) and anyLogistix-driven models built with SimWell, ICP tested scenarios for plant siting, product allocation, DC counts/locations and transport strategies. The digital twin improved coverage metrics as DCs were reconfigured and drove significant cost reductions — roughly 18% savings versus the 2022 historical baseline and 7% versus the alternative baseline — enabling scalable, ongoing network optimization with anyLogistix.