CNG Foresight, a company in the transportation sector, was developing a major framework to build a portfolio of bio-CNG fuelling stations across the UK. They faced the challenge of validating the proposed station design and technical aspects of this £100m+ project to ensure it was viable and could fuel up to 450 vehicles per day. They commissioned Anthesis to deliver a technical due diligence study.
Anthesis delivered a comprehensive review that included the station's site layout, process equipment, health and safety, grid connection solutions, and technical input to the financial model. As a result, Anthesis confirmed the suitability of the technical solution and provided recommendations that led to the development of the first bio-CNG fuelling station in South East England, enabling customers to decarbonize their fleets with renewable fuel.