Case Study: Paul Y Engineering Group achieves a fully electrified, zero-diesel construction site with Ampd Energy’s Enertainer

A Ampd Energy Case Study

Preview of the Paul Y. Engineering Group Case Study

Paul Y. Engineering Group cuts diesel use with Ampd Energy, achieving 72% CO2 reduction

Paul Y. Engineering Group, a main contractor for a residential development in Hong Kong, aimed to support the city's goal of carbon neutrality by 2050. The challenge was to eliminate diesel generators from their construction site on Lee Kung Street to reduce their carbon footprint and operational costs. To achieve this, they partnered with Ampd Energy and utilized the Enertainer.

Ampd Energy's solution was the Enertainer, which enabled the site to be fully electrified, completely removing the need for diesel gensets. The results were significant, with the Enertainer reducing operating costs by 71% and cutting CO2 emissions by 72% compared to a traditional 350 kVA diesel generator. This led to zero on-site air pollution and provided a healthier environment for workers. Paul Y. was so impressed that they purchased multiple Enertainer units for other projects.


View this case study…

Ampd Energy

11 Case Studies