Case Study: McGoff Construction achieves zero-emission, diesel-saving site power with Ampd Energy's Enertainer

A Ampd Energy Case Study

Preview of the McGoff Construction Case Study

McGoff Construction cuts 302k litres of diesel with Ampd Energy

McGoff Construction faced the challenge of powering a large inner-city residential development in Manchester, which required significant energy for two tower cranes, two hoists, and temporary electric supplies for four blocks. The traditional approach of using multiple diesel generators created logistical issues, traffic from fuel deliveries, and negative environmental impacts. They turned to Ampd Energy and its Enertainer product for a solution.

By implementing Ampd Energy's Enertainer, a zero-emission power source, the site eliminated the need for numerous diesel generators. This solution from Ampd Energy provided a centralized, quiet power supply, which reduced road traffic and delivery delays, minimized disturbance to local residents, and had a significantly positive environmental impact. The Senior Project Manager confirmed the system operated as a seamless one-stop solution for the project's entire power needs.


View this case study…

Ampd Energy

11 Case Studies