Laing O’Rourke and its subsidiary, Select Plant, faced significant challenges while working on the Olympia London redevelopment project. Limited mains power led them to initially use diesel generators for their tower cranes, which resulted in high carbon emissions, air pollution, and operational issues including breakdowns and logistical problems. To address these issues, they partnered with Ampd Energy.
Ampd Energy implemented its Enertainer battery energy storage systems to replace the diesel generators. Over 12 months, this solution from Ampd Energy saved an estimated 192 tonnes of carbon emissions, reduced operating costs by 70%, and eliminated air pollution equivalent to that of 975 cars, all while providing more reliable and quieter power for the construction site.