The customer, GMI Construction, faced the challenge of operating a construction site on Rochdale Road in Manchester while adhering to strict local silent hours designed to avoid disturbing residents. To address this, they partnered with vendor Ampd Energy to utilize its battery power solution, the Enertainer.
Ampd Energy's solution involved using the Enertainer to silently power nighttime site operations like lighting and CCTV during restricted hours, with a diesel generator only running during the day to recharge the battery. This approach resulted in a 50% financial cost saving against using a diesel generator alone and completely eliminated noise complaints from neighbors throughout the project.