A large costs maintenance service provider faced significant expenses when a critical 220 kV power line had to be taken offline for scheduled maintenance, as this required costly redispatch plans. To address this challenge, they worked with Ampacimon.
Ampacimon equipped an adjacent power line with four ADR Sense modules and monitored it with their ADR Operate software. This solution enabled the adjacent line to safely carry an additional 40% of its capacity for three months. As a result, Ampacimon made it possible for the grid operator to implement more flexible, less constraining, and far less costly maintenance plans.
Large Costs Maintenance Service Provider