Case Study: Town of Ashland achieves 2.2 million kWh annual energy savings and 1,632 metric ton CO2 reduction with Ameresco

A Ameresco Case Study

Preview of the Town of Ashland Case Study

Town of Ashland - Customer Case Study

The Town of Ashland engaged Ameresco to tackle rising energy costs, reduce greenhouse gas emissions, and bring a capped municipal landfill into compliance with the Massachusetts DEP. Ameresco proposed solar photovoltaic projects — 5,500 panels totaling 1,800 kW DC — paired with a 20‑year power purchase agreement to deliver economic and environmental benefits across multiple town sites.

Ameresco designed, permitted, financed, built, owns and operates three solar systems (middle school roof, high school parking lot, and landfill), secured SREC incentives, and provides ongoing O&M. Via net metering, 100% of the generation powers town operations, producing 2.2 million kWh in annual savings and cutting CO2 emissions by 1,632 metric tons while restoring landfill compliance.


Open case study document...

Town of Ashland

Michael D. Herbert

Town Manager


Ameresco

139 Case Studies