NAVFAC needed to eliminate downtime and improve energy resilience at the 4M sq. ft. Portsmouth Naval Shipyard, where loss of the public utility would threaten mission-critical operations. To address reliability and efficiency goals, NAVFAC engaged Ameresco under an Energy Savings Performance Contract (ESPC) to deploy a microgrid solution along with combined heat and power, energy storage, and long‑term operations & maintenance services.

Ameresco delivered a three‑phase ESPC that included a 10.4 MW / 280,000 lb/hr CHP plant (two 5.2 MW Solar Taurus 60 gas turbines), a 500 kW / 580 kWh battery energy storage system, new protective relaying and fast load‑shed microgrid controls, plus extensive steam, air, and lighting upgrades. The $44M project (plus a $3.6M DOD grant) gave the shipyard islanding capability, 10 MW winter / 5 MW summer / 14 MW emergency capacity, retired aging boilers, and measurable impact: annual energy savings reported at $6.2M (2016) and up to 43.165 million kWh saved, with improved reliability and reduced exposure to energy price volatility.


Open case study document...

NAVFAC

Russell Gagner

Production Division Director


Ameresco

139 Case Studies