Case Study: Toyo Engineering Corporation reduces workload to a fraction and achieves up to 30× faster processing with Alteryx

A Alteryx Case Study

Preview of the Toyo Engineering Corporation Case Study

Toyo Engineering Reduces its Workload to a Fraction

Toyo Engineering Corporation, a global EPC serving the hydrocarbons and petrochemical sectors, struggled with massive 3D CAD databases for each plant—tens of thousands of tables and millions of records—requiring engineers to extract and process data via dozens of SQL scripts, Excel, and Access. This manual approach overloaded staff, limited scalability, and conflicted with the company’s digital-transformation goal to cut non-core work by 30%.

By trialing Alteryx with partner Classmethod, Toyo automated complex conditional processing, consolidated many SQL types, and created multi-purpose reports that once took hours in under a minute. The team reports Alteryx is 10–30× more efficient than Excel and 5–10× faster than Access, dramatically reducing workload, lowering error risk, and enabling engineers to focus on core activities.


Open case study document...

Toyo Engineering Corporation

Shuntaro Saito

IT Service Department


Alteryx

343 Case Studies