Case Study: Grupo Hefame achieves a future-proof 40Gbps network core with Allied Telesis

A Allied Telesis Case Study

Preview of the Grupo Hefame Case Study

Grupo Hefame - Customer Case Study

Grupo Hefame, a Spanish pharmaceutical distribution cooperative and producer of cosmetics and skincare products, needed to modernize its datacenter network to support new servers, higher application demand, and dependable delivery operations. With Allied Telesis, the company set out to raise core bandwidth from 10Gbps to 40Gbps while improving convergence, redundancy, and overall network performance.

Allied Telesis upgraded Hefame’s core to four SwitchBlade x908 GEN2 switches using VCStack long-distance stacking and link aggregation, while reusing older Allied Telesis switches as distribution devices. The result was a simpler, fully redundant, future-ready network with higher throughput, lower latency, improved management through AMF, and support for 100Gbps expansion, helping Hefame run production and delivery smoothly and on schedule.


Open case study document...

Grupo Hefame

Amando Vela

CIO


Allied Telesis

70 Case Studies