Case Study: Department of Foreign Affairs achieves a non-stop, high-availability network with Allied Telesis VCStack

A Allied Telesis Case Study

Department of Foreign Affairs builds a non-stop network with Allied Telesis VCStack

The Department of Foreign Affairs (DFA) in the Philippines required a high availability network infrastructure to ensure robust security and continuous access to its business-critical resources. To meet this challenge, the DFA selected an Allied Telesis Virtual Chassis Stacking (VCStack) solution.

Allied Telesis implemented its VCStack technology, which eliminated single points of failure and automated failure recovery. The solution, which included the resilient SwitchBlade x908 modular switch at the network core, provided the DFA with an unbreakable network that minimizes downtime and ensures all resources remain fully utilized. This resulted in a lower total cost of ownership and was backed by an enhanced joint support framework with Allied Telesis and its partner.


View this case study…

Allied Telesis

135 Case Studies