Case Study: CyrusOne achieves on-time, on-budget IT-ready 7MW Chandler data center build with Align

A Align Case Study

Preview of the CyrusOne Case Study

CyrusOne - Customer Case Study

CyrusOne partnered with Align to deliver a 7MW IT‑ready data center suite in Chandler, Arizona after a large cloud services firm leased the space. The project faced a compressed schedule — a contracted 180‑day completion with a critical milestone of commissioning power within 107 days — plus added complexity when the tenant required network equipment to be brought online before the standard technology fit‑out was finished.

Align led the design and deployment, coordinating long‑lead procurement, detailing client‑specific IT infrastructure, and prioritizing equipment‑ready areas so network gear could be energized early. As a result, Align met the 107‑day power commissioning milestone, achieved cabinet‑level power within the 180‑day timeline, and delivered an on‑time, on‑budget, state‑of‑the‑art IT‑ready data center that satisfied all project requirements.


Open case study document...

Align

39 Case Studies