Align
35 Case Studies
A Align Case Study
Leading Global Investment Firm engaged Align to improve the technology supporting 250 professionals at its London headquarters. The client required replacement of incumbent Nortel switches with Cisco equipment and an upgrade of the cabling infrastructure to augment network capacity, reduce operational costs, and enable better IT planning and growth.
Align conducted a full audit and port mapping, developed a patching schedule using existing cabling where possible, removed and disposed redundant kits per WEEE, and completed switch upgrades, installation, testing, and new patch lead installation. Align’s work increased network port capacity by 30%, standardized and consolidated redundant systems to avoid an expensive capital upgrade, and produced ongoing savings from reduced electrical and cooling requirements.
Leading Global Investment Firm