Case Study: INEOS Köln achieves over 90% plant utilization with AIMMS

A AIMMS Case Study

Preview of the INEOS Case Study

INEOS Köln achieves over 90% Plant Utilization with AIMMS-based Application

INEOS Köln, a major petrochemical site with about 1,900 employees and a key raw‑materials supplier to the chemical industry, needed to replace an aging production simulation tool. The challenge was to capture a highly integrated production process—160 raw materials and end products across more than 25 production units—and to compute day‑to‑day production, stock and transport needs for years ahead within reasonable run times.

AIMMS delivered a pilot that became a new DISPO App in months, offering repetitive time‑based modeling, live connections to a central database, SAP and intranet reporting, plus a separate steam‑cracking optimization app. The solution gives transparent, company‑wide visibility of past, current and future production, enabling early detection of bottlenecks; INEOS Köln now achieves over 90% plant utilization with faster, more transparent planning.


Open case study document...

AIMMS

53 Case Studies