AHEAD
21 Case Studies
A AHEAD Case Study
Wake Forest Baptist Medical Center, an integrated health system in Winston-Salem, NC, needed to replace its aging and costly IT infrastructure to achieve 100% uptime for patient safety and care. The medical center turned to AHEAD for help, seeking a partner that could provide both strategic guidance and a reliable path to modernizing its environment without risking failure.
AHEAD implemented a converged infrastructure solution based on VCE Vblock, replacing legacy network, storage, and server systems at the same time. The results included network uptime rising from 87% to 100%, maintenance and support costs dropping from 44% to 10% of budget, 30% better end-user performance, and the ability to spin up new environments in 3–4 hours, all while improving scalability, security, and patient care.
Chad Eckes
EVP and Chief Financial Officer