Case Study: Slidell Memorial Hospital ensures hurricane-ready continuity with Agility Recovery

A Agility Recovery Case Study

Slidell Memorial Hospital prepares for hurricanes with Agility Recovery’s 229-bed continuity plan

Slidell Memorial Hospital, an acute-care facility serving its community for over 60 years, needed to ensure it could maintain operations and patient care during a disaster. The hospital partnered with Agility Recovery and utilized its flexible generator solution to preplan their response to a potential storm like Hurricane Karen.

Agility Recovery delivered the specific generator needed to operate the hospital if power was lost, ensuring it arrived before the storm made landfall. While the generator was not ultimately needed, the hospital was fully prepared to provide critical care. Slidell Memorial Hospital found Agility Recovery's solution to be a cost-effective way to prevent future business continuity problems.


View this case study…

Agility Recovery

56 Case Studies