Sutter Solano Medical Center achieves OSHPD compliance with Aeroseal and cuts duct leakage from 653.3 CFM to 0

Sutter Solano Medical Center faced a critical challenge when its new ventilation system's ductwork had excessive leakage, preventing it from drawing sufficient air and failing to meet OSHPD codes. With final inspection imminent and no room for manual repairs, the medical center turned to vendor Aeroseal and its duct-sealing service to resolve the issue.

Aeroseal implemented its proprietary process, which involved injecting sealant particles into the ducts to automatically find and seal leaks. The results were immediate and dramatic, reducing leakage from 653.3 CFM to 0 CFM in a single afternoon. This made the system OSHPD compliant and achieved annual energy cost savings of $1,438 for the medical center.