Case Study: St. Alban’s Anglican Church improves HVAC performance with Aeroseal duct sealing

A Aeroseal Case Study

St. Alban’s Anglican Church reduces duct leakage by 93% with Aeroseal

The customer, St. Alban's Anglican Church, was experiencing significant heating and ventilation issues with its new HVAC system. After over a year of searching for the cause, the church facility manager and project manager discovered they were losing 665 CFM of treated air through duct leakage. They enlisted the vendor, Aeroseal, to address this challenge with its duct sealing service.

The Aeroseal solution was implemented in a matter of hours without disrupting the church's operations or new construction. The process sealed the ductwork and achieved a 93% reduction in leakage, bringing the loss down to just 49 CFM. This not only fixed the heating problem but also improved overall HVAC airflow, stopped the spread of germs through leaks, and allowed the ERV system to operate more efficiently at half the power. The project manager for St. Alban's called Aeroseal a "project saver" for being the fastest, easiest, and least expensive solution.


View this case study…

Aeroseal

71 Case Studies