El Seif Engineering Contracting Company, a leading construction company in the Middle East, faced a costly shutdown on two high-profile mixed-use towers in Riyadh's King Abdullah Financial District. The buildings failed pressure tests due to significant duct leakage in their HVAC systems, halting construction. To solve this challenge, they employed the services of Aeroseal contractor AWT Services, utilizing the Aeroseal duct sealing technology.
The solution implemented by Aeroseal was highly effective, sealing leaks in ductwork that was otherwise inaccessible for manual repair. This resulted in a dramatic 98.3% reduction in total duct leakage, bringing it down from 15,289.6 CFM to just 257 CFM. This successful outcome allowed both buildings to immediately pass inspection, enabling construction to resume and keeping the high-profile project on track.