Aegis Software
11 Case Studies
A Aegis Software Case Study
K2 Energy, a Henderson, NV manufacturer of lithium iron phosphate batteries for aerospace, defense, and industrial applications, faced limited control and flexibility from a manual, paper-based production tracking system. To meet stringent AS9100 and ITAR requirements and support larger, complex contracts, K2 evaluated MES options and selected Aegis Software’s FactoryLogix to replace paper records and provide real-time shop floor control.
Aegis Software implemented FactoryLogix with a two-phased, 60-day deployment and two weeks of on-site training, delivering digital work instructions, strict access controls for ITAR, automated data acquisition, and real-time dashboards. The solution yielded measurable benefits for K2 Energy — including an 80% reduction in manual data entry, automated report generation (replacing ~10 hours/week of manual work), fewer non‑conformance events, faster turnaround times, and scalable growth that strengthened bid competitiveness and ROI.
Mike Hojati
Senior Manufacturing Engineer