M&G Real Estate, the asset manager for the Fürst & Friedrich office building, sought to identify optimization potential and reduce excessive energy consumption in the modern property's technical operations without compromising user comfort. To meet these economic and sustainability objectives, they partnered with aedifion and implemented its cloud platform.
aedifion seamlessly integrated its platform into the existing building automation system for real-time data analysis and AI-based optimization of HVAC operations. This solution, which included predictive control based on weather and occupancy, achieved significant results. aedifion's implementation led to a 29% reduction in energy consumption, saving 560,300 kWh annually, and a 28% reduction in energy costs, equating to €89,000 in annual savings.