Case Study: ECE Group achieves major energy savings at Ettlinger Tor with aedifion

A aedifion Case Study

Preview of the ECE Group Case Study

Iconic Building of Energy Efficiency and Global Charm

The ECE Group, manager of the Ettlinger Tor shopping center, sought to analyze its technical systems and sustainably reduce operating costs while maintaining a comfortable indoor climate with maximum energy efficiency. To meet this dual challenge, they partnered with aedifion and implemented its cloud platform and data-driven optimization services.

aedifion's solution provided transparent, real-time control of all technical systems, delivering customized optimization recommendations that were automatically implemented. This resulted in significant annual savings of €57,000 in operation costs and 645 MWh in energy, while also avoiding 74 tons of CO2 emissions. Key measures included optimizing air handling units, fixing a faulty sensor, and introducing predictive heating control, with further automated optimizations underway by aedifion.


Open case study document...

ECE Group

Mario Graf

Technical Manager


aedifion

13 Case Studies