Advantive worked with a global agricultural and construction equipment manufacturer in Kansas to address a challenge with inefficient tugger routes in their plant. The manufacturer's logistics team lacked a visual and efficient method to analyze and optimize their material delivery routes, which had not been updated to reflect the plant's growth.
Using Advantive's Proplanner Flow Planner solution, the vendor's team mapped the current routes and modeled new, optimized paths over a five-day engagement. This process resulted in a 17% increase in route efficiency and an annual labor cost reduction of $80,000, allowing the manufacturer to reduce the number of required tugger drivers per shift.