Acuren
6 Case Studies
A Acuren Case Study
A client, a pipeline operator, faced a challenge with its 100-mile pipeline after an in-line inspection reported thousands of ambiguous cracklike features. This led to pressure reductions that hampered the line's capacity. The client turned to Acuren for a comprehensive integrity solution to re-establish the maximum operating pressure and secure a reassessment interval.
Acuren managed a project that included nitrogen purging, anomaly cutouts, a specialized spike test on a heavy-wall section, and a full hydrostatic test on the entire pipeline. The solution successfully re-established the pipeline's maximum operating pressure, restored its flow capacity, and secured a five-year reassessment interval. The project was completed ahead of schedule and under budget, exceeding the client's expectations.
A Client