Case Study: Sanofi cuts time to production by 80% with 55 Degrees

A 55 Degrees Case Study

Preview of the Sanofi Case Study

Sanofi cuts time to production by 80% with 55 Degrees

Sanofi, a global healthcare company, faced challenges in its traditional, large-scale organizational structure, which lacked the flexibility for agile product delivery. Their processes were rigid, leading to slow production times and a need for both cultural and technical shifts to improve predictability and efficiency. They partnered with vendor 55 Degrees and implemented its ActionableAgile® Analytics product to address these issues.

55 Degrees' solution provided Sanofi with real-time flow metrics and probabilistic forecasting within their existing Jira environment. This enabled a shift from a task-focused approach to a flow-based one, significantly improving transparency and efficiency. The measurable impact was an 80% reduction in time to production, from an average of three months down to just 12 days, while also fostering a sustainable culture of continuous improvement.


View this case study…

55 Degrees

13 Case Studies