4M Analytics
12 Case Studies
A 4M Analytics Case Study
The Georgia Department of Transportation (GDOT) manages a vast state transportation network and faced significant challenges in utility coordination. With aging infrastructure and fragmented, incomplete records from numerous utility owners, knowing what was underground before starting a project was nearly impossible. This led to costly delays and risks. GDOT partnered with vendor 4M to explore their AI-powered Utility Data Platform as a solution.
4M's platform provided instant, verified utility intelligence by using an AI conflation process to capture and verify data. The solution saved GDOT 1,800 man-hours compared to manual processes, achieved a 100% utility capture rate with 3-foot accuracy in a pilot, and reduced concept planning preparation from a week to just an hour. Following a successful pilot, 4M was deployed statewide to over 150 users, enabling smarter, faster decision-making and significantly reducing the risk of utility conflicts and construction delays.