Major Clean Energy OEM faced a critical deadline: a new factory had to open in under two months, but their existing MES could not scale to support both chemical-process subassemblies and complex industrial-system assembly, nor provide cross-plant visibility, flexible high/low-mix workflows, clear operator UIs, or robust genealogy and serialization. The customer selected 42Q and its cloud-based MES solution to meet those requirements and deploy rapidly.
42Q implemented its cloud MES using a Rapid Production Model deployment, completing design, configuration, training and go‑live in under two months so the plant opened on schedule. The 42Q solution delivered measurable gains—traceability and genealogy analysis time dropped from about three months to days, a single set of dashboards now covers multiple plants, and the subscription, no-infrastructure model provided predictable pricing and faster rollouts backed by 24/7 support.