Case Study: Fort Garry Industries achieves 50%+ faster shipment processing and zero manual paperwork with 3G Pacejet Shipping

A 3G Case Study

Preview of the Fort Garry Case Study

Fort Garry Industries Drives Growth with 3G Pacejet Shipping

Fort Garry Industries, a leading Canadian truck and trailer parts and service provider, was struggling with slow, manual shipping processes that could take 20–30 seconds just to create a shipment plus time-consuming label printing and paperwork. These bottlenecks made it hard to hit their 60-shipments-per-hour target, pushed carrier pickups later, and created costly overtime as the business scaled and required both API-connected and non-API carrier support.

Implementing 3G Pacejet Shipping cut shipment creation to as little as 10 seconds, automated paperwork, and introduced a Contract Rates Module to load contracted rates for non-API carriers so all carriers could be rate-shopped. The result was a 50%+ reduction in processing time, eliminated manual printing, improved accuracy and on-time delivery, reduced overtime, and stronger capacity to support growth.


Open case study document...

Fort Garry

Mike Frenz

Logistics Manager


3G

55 Case Studies