3D Systems
486 Case Studies
A 3D Systems Case Study
VAULT, a 20+-year leader in configurable tablet enclosures for the POS industry, faced a tight pre-production timeline: design, approval, tooling and production in under two months to meet a trade-show deadline. With shrinking project windows, VAULT needed a faster way to validate concepts, communicate designs, and prepare tooling and packaging.
By using 3D Systems’ ProJet 7000 HD SLA and Accura ClearVue™ material, VAULT produced high-fidelity, transparent prototypes that sped approvals and clarified fit and function. The result: a fully functional prototype approved in two weeks, accelerated mold manufacturing and post-op setup, earlier packaging development, faster time to market—and stronger customer buy-in that helped win new business.
Quentin Forbes
VP Engineering