3D Systems
486 Case Studies
A 3D Systems Case Study
The Jerde Partnership, a Venice, CA–based architecture and urban planning firm behind projects like the Bellagio and Mall of America, needed a faster, more cost‑effective way to convey complex design visions. Traditional hand-built models required specialist modelers and time‑intensive translation of concepts into detailed drawings, slowing collaboration with clients and internal teams.
After evaluating options, Jerde adopted the ZPrinter 310 Plus, which prints directly from Autodesk 3D Studio MAX, requires no removable supports and delivers superior speed and resolution. The firm cut model production dramatically (a detailed San Diego waterfront model that would have taken a week was printed in under half a day), reduced cost and labor, enabled more complex and multiple iterations, and improved collaboration and design experimentation across projects.
Al Vass
Associate Vice President and Senior Project Designer