3D Systems
486 Case Studies
A 3D Systems Case Study
Junker & Halverscheid and JuHa Kunststoffverarbeitung (JuHa), based in Lüdenscheid, Germany, provide mold construction and high-quality thermoplastic and silicone parts. They struggled with slow turnaround, complex decision-making and unwieldy form-building caused by multiple CAD/CAM interfaces and sought a single, homogeneous system to improve speed and efficiency.
After selecting Cimatron’s integrated mold-design, electrode development, NC coding, EDM setup and data-interface solution, the companies moved to a unified 3D workflow and automated processes. The change cut electrode production time by over 50%, reduced mold construction, assembly and delivery times by about 30%, and improved flexibility, quality and price competitiveness—faster, more accurate bids, fewer errors and parallelized documentation.
Rüdiger Gössling
Head of Mold Engineering