HENLE Baumaschinentechnik, a family-owned German manufacturer of construction machinery components, faced the challenge of meeting increasing demand by improving efficiency and productivity at their production facility. They selected the APM solution from vendor 3d Signals to digitally monitor their equipment and identify areas for optimization.
The solution from 3d Signals was installed across all production machines and provided HENLE with deep visibility into non-value-added idle times. This led to a significant classification and reduction of bottlenecks, including a 41% reduction in setup time, a 67% reduction in delays from lack of materials, and completely eliminating delays from a lack of staff. These improvements resulted in a 10% overall productivity increase for HENLE without requiring a heavy capital investment.