Case Study: AstraZeneca reduces energy use and costs with 360 Energy

A 360 Energy Inc Case Study

Preview of the AstraZeneca Case Study

AstraZeneca Reduces Energy Usage & Optimizes Procurement

AstraZeneca Canada faced the challenge of meeting its parent company's ambitious global greenhouse gas reduction targets while managing the higher ROI requirements for environmental projects. To address this across their multi-building Mississauga campus, they partnered with vendor 360 Energy to implement a comprehensive energy management and procurement program.

The solution from 360 Energy included implementing advanced electrical metering, upgrading to LED and motion-sensor lighting, installing automated load shedding systems, and optimizing refrigeration equipment. 360 Energy also provided strategic utility procurement and ongoing market guidance. As a result, AstraZeneca reduced its natural gas consumption by over 50% and achieved annual electricity reductions of at least 10% in key buildings, leading to significant cost savings and the successful meeting of their environmental goals over their eight-year partnership.


View this case study…

360 Energy Inc

16 Case Studies