The BG&E and Cardno Design Joint Venture (DJV) faced the demanding challenge of delivering Queensland's first fully integrated BIM pilot project for the Department of Transport and Main Roads. The Ipswich Motorway Upgrade involved complex design within a constrained corridor and required managing BIM across multiple platforms under tight time and budget constraints. To address this, they implemented 12d Synergy as the project's common data environment.
Using 12d Synergy, the joint venture created a controlled environment for BIM management, document control, and worksharing. The solution enforced quality standards, enabled a fully digital review process, and supported flexible collaboration for over 80 staff. The results included the successful delivery of the $400 million project, the replacement of a paper-based system with over 20,000 digital mark-ups, and the creation of a benchmark for future digital transport delivery in Queensland.