Durkin Construction Pty Ltd faced significant challenges in managing utility data for the Ryde Transmission Feeder project. The process of integrating detailed utility information into a single 3D model was inefficient, costly, and prone to human error, as data was often stored in separate, inconsistent datasets. This manual system made clash detection and analysis difficult for the team. They turned to 12d Solutions enabled the creation of custom macros that automated the entire data validation, processing, and labelling workflow. This solution eliminated manual errors, drastically reduced processing time from days to minutes, and created a highly efficient, integrated system for utility modelling. The result for Durkin Construction was a vastly simplified procedure, datasets that were easier to manipulate, and a significant reduction in both time and monetary costs on the project.