Case Study: Mott MacDonald delivers a low-disruption Canberra Airport terminal upgrade with 12d Model

A 12d Solutions Case Study

Preview of the Mott MacDonald Case Study

Mott MacDonald - Customer Case Study

12d Solutions worked with Mott MacDonald on the upgrade of Canberra Airport. The client's challenge was to design a new, larger terminal precinct over an existing one with minimal disruption, requiring detailed 3D design of the internal road network, underground utilities, a new apron, and the management of critical Obstacle Limitation Surfaces for aviation safety.

The solution from 12d Solutions involved using their 12d Model software for a multi-user, multi-stage design approach. This allowed for the modelling of existing utilities, stormwater flows, and complex OLS boundaries to predict and mitigate potential construction problems. The result was a highly detailed design that provided the client with the information needed to create detailed construction plans and safely avoid dangerous interference with the airport's existing operations.


Open case study document...

12d Solutions

99 Case Studies