Case Study: Harrison Infrastructure Group achieves rapid 3D bridge visualisation with 12d Model

A 12d Solutions Case Study

Preview of the Harrison Infrastructure Group (HIG) Case Study

Harrison Infrastructure Group (HIG) - Customer Case Study

HarD visualization for a new double-arched bridge design on the Toowoomba Second Range Crossing project after the Department of Transport and Main Roads required a last turned to the civil engineering design software from vendor 12d by constructing each bridge component in its own model, utilizing the software. The solution from 12d Solutions enabled HIG to deliver the required information both quickly and easily, ensuring the project's stakeholders could visualize the final outcome even though construction had only just begun.


Open case study document...

12d Solutions

99 Case Studies