The customer, Calibre Rail, acting as the EPCM contractor for Fortescue Metals Group, faced significant challenges in upgrading the Rowley Marshalling Yard. Their task was to deliver a detailed design for the rail and drainage infrastructure with minimal disruption, but they were constrained by tight timelines, logistical issues from a remote location, and a lack of prior planning for the brownfield site. They utilized 12d Solutions' 12d Model software to tackle complex earthworks, track layout, and stormwater drainage design.
Using 12d Model's specialized tools for rail and drainage, Calibre Rail efficiently investigated over 20 track layout options and performed a detailed cost/benefit analysis on drainage pipe sizes. The solution implemented by 12d Solutions saved the project over $2 million AUD in capital costs. Despite initial difficulties, the project was successfully completed, with the client expressing high satisfaction with the final result achieved through the powerful and versatile functionality of the 12d Model software.
Chris Compton
Calibre Rail